Comparison of the pile testing results on Expo-2017 (Kazakhstan)

Loading...
Thumbnail Image

item.page.other-contributor

item.page.advisors

item.page.editors

Date

Publisher

item.page.issn

item.page.isbn

item.page.depon

item.page.diss

Journal Title

Journal ISSN

Volume Title

item.page.title-alternative

Abstract

The article presents loading tests of large diameter and deep boring piles on the construction site in new capital city of the Republic of Kazakhstan. Finally, some recommendations for testing methods suitable for problematical ground conditions of Kazakhstan are introduced. Traditionally, pile load tests in Kazakhstan are carried out using static loading test methods. Static pile loading test is the most reliable method to obtain the load-settlement relation of piles. Results of static pile tests using the static compression loading test (by ASTM – SCLT), static loading test (by GOST – SLT) and bidirection static loading test (by ASTM – BDSLT or O-cell) methods are presented in this paper. Experienced bored piles with length of 31.5 m, diameter 1000 mm. Bi-directional static loading test and Static compression loading test carried out in accordance to ASTM D1143-07 and Static loading test carried out in accordance to GOST 5686-94, (1994). Hereafter the results of underground testing by the piles with the methods of vertical static testing BDSLT are presented, which had been made on Expo 2017 projects, buildings of Pavilion in Astana, Kazakhstan.

item.page.description-other

Description

Citation

Comparison of the pile testing results on Expo-2017 (Kazakhstan) / A. Zh. Zhussupbekov [et al.] // Геотехника Беларуси: наука и практика = Geotechnics in Belarus: science and practice : материалы Международной конференции, Минск, 23-26 октября 2018 г. / Белорусский национальный технический университет ; сост.: В. А. Сернов [и др.]. – Минск : БНТУ, 2018. – С. 163-174.